This facilitates the work with more in-depth analysis of the internal set-up with possibility to find the best working method. Standard Time setting also makes it possible to simulate the proposed improvements to get an idea of the outcome in increased productivity.
Filming of the setup eliminates the risk of missing important issues in the analysis. The analysis in AviX® is quickly created even at long (> 1hr) set-ups and provides direct separation in internal and external set-up. The film also facilitates communication within improvement groups and to other parts within an organization.
The simple handling of various resources, allowing several operators to work in parallel with different tasks, makes it possible to analyze set-ups with multiple machines. With built-in logic, tasks starting or ending before another task, can be separated.
For the process industry a very good basis is created to be able to work with reduced batch sizes as well as with planned and standardized maintenance. Reports for set-up- & maintenance instructions can easily be printed with or without images.